Onsite Wastewater Treatment (Septic) System Design – Price $750+

Request

The design includes a site visit and the supply of permit/construction ready drawings for an Onsite Wastewater Treatment (Septic) System capable of handling onsite produced waste water.

Onsite Wastewater Treatment (Septic) Assessment – Price $250 – $325

Request

The assessment of the Onsite Wastewater Treatment (Septic) System will be performed per the Missouri Dept. of Health and Senior Services guidelines as they apply to real estate transactions. The client will receive the state required assessment forms along with a summary that includes repair recommendations and pictures as required.

Onsite Wastewater Treatment (Septic) Survey – Price $250 – $325

Request

The survey of the Onsite Wastewater Treatment (Septic) System will be performed similar to the requirements of the Missouri Dept. of Health and Senior Services guidelines as they apply to real estate transactions. The client will receive a report includes repair recommendations and pictures as required. No state assessment forms will be provided.

Well Water Testing – $100

Request

The testing includes the laboratory testing of one (1) water sample for the presence of E.coli and coliform bacteria, and the supply of a report of findings.

Structural Inspection – $460+

Request

The inspection will include the evaluation of a structural issue, or issues, using non-destructive means. The client will receive a report addressing the cause, extent, and recommended repairs.

Manufactured Home Foundation Certification – $460

Request

The certification will include the evaluation of a manufactured home foundation for compliance with guidelines established by the Department of Housing and Urban Development (HUD) as defined in their document, the Permanent Foundation Guide for Manufactured Homes.